PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Block work at the 1st floor detention cells Facing North-West.jpg Block work finihsed at the EMR Room 150A Facing South.jpg Cooper piping at the 1st floor bathroom 133-136 Facing North.jpg Erecting stone panels at the North Elevation 1.jpg Erecting stone panels at the North Elevation 2.jpg Installed damper controllers at the 1st floor Facing East.jpg
Previous pageNext page Block work finihsed at the EMR Room 150A Facing South
Block work finihsed at the EMR Room 150A Facing South